The proposed 200 megawatt Milford Wind project will comprise:
- Up to 97 wind turbine generators
- A 90-mile transmission line connecting the wind farm to the Intermountain Power Agency in Delta, Utah
- Up to 13 meteorological towers
- A 34.5-kV power underground collection system linking each turbine to the next and to the Facility substation
- A Facility collector substation
- A transmission line for interconnection with the IPP substation in Delta, Utah
- An interconnection facility (i.e., switching station) at the connection between the Facility transmission line and the IPP substation
- Approximately 36 miles of newly constructed access roads and turnaround areas
- A Supervisory Control And Data Acquisition (SCADA) system.
|
 |